Property layouts can vary, that is why we request pictures before providing an EV charge point installation plan.
INCOMING ELECTRICITY SUPPLY METER
A clear picture of your incoming electricity supply and meter. This could be located in a box on the outside of your house or close to your fuse board.
WATER & GAS EARTH BONDING
The earth bonding cable should be ( GREEN & YELLOW ) and connected with a safety earth strap to the copper pipes


POSSIBLE CABLE RUN FROM THE ELECTRICITY SUPPLY TO THE CHARGING POINT LOCATION
Provide pictures that demonstrate the most appropriate path for the cable to take from the point of electrical connection to your preferred charging point location.
CAR CHARGING POINT LOCATION AND SURROUNDING AREA
Show the desired location of your new charger and the ground area. Ideally there will be soft ground somewhere close by.
FUSE BOARD LOCATION AND A CLOSE UP
At least one picture of your fuse board and a picture of fuses + 1 MTR away to show area surround
SUPPLY THE MPAN NUMBER
Your Meter Point Administration Number (MPAN) is the unique identity reference number for your electricity meter. Sometimes called an ‘S number’ or ‘Supply Number’, your MPAN should be easy to spot on your meter or bill as it’s a 21-digit number that begins with an ‘S’.
